No. 132 - Proposed storm water management system to facilitate re-development of the former Officers Building, Abbeycarton, Longford

Project Description

Proposed storm water management system to separate the existing combined sewer to facilitate the re-development of the former Officers Building, Abbeycarton, Longford, Co. Longford, a Protected Structure, situated within the grounds of Sean Connolly Barracks.

The proposed development will consist of:

• The provision of a separate stormwater drainage system to discharge stormwater generated from roof and local hardstanding areas of the existing Officers Building and proposed extension only.
• System to include a gravity stormwater sewer to the perimeter of the building, which is to discharge to an onsite stormwater storage system, which will in-turn discharge stormwater to the Camlin River via a flow control device.

Submissions

Submissions with respect to the proposed development, dealing with the proper planning and sustainable development of the area, may be made  by the following methods:

  • Logging onto the Planning Portal by the following link and uploading your submission electronically: planning.localgov.ie to arrive not later than 11:59pm on Friday, 15 August 2025.
  • In writing to Longford County Council, headed “Part 8 - Proposed storm water management system to facilitate re-development of the former Officers Building, Abbeycarton, Longford" and addressed to Planning Section, Longford County Council, Áras an Chontae, Great Water Street, Longford to arrive not later than Friday, 15 August 2025 at 4pm.
  • By email to submissions@longfordcoco.ie headed "Part 8 - Proposed storm water management system to facilitate re-development of the former Officers Building, Abbeycarton, Longford" to arrive not later than Friday, 15 August 2025 at 4pm.

Related Files

Newspaper Notice

Site Notice

Archaeology Letter

AA Screening Report

Planning Statement

Flood Risk Assessment

Preliminary EIA Screening

Technical Note Storm Water System Design

Site Location

Proposed External Works Details

Proposed Storm Long Section

Proposed Stromwater Layout